A-5 ~Threaded Union

Short Description:

Threaded unions is used When an economical threaded pipe connection is needed, the surface of the union is available both hot-dip galvanizing and electroplating. Both ends provided with a malleable iron union with female thread BS or ANSI.


Product Detail

Our available goods

Threaded unions is used When an economical threaded pipe connection is needed, the surface of the union is available both hot-dip galvanizing and electroplating. Both ends provided with a malleable iron union with female thread BS or ANSI.

Specifications

I

II

III

Working Pressure Mpa (Kgf/Cm2)

1Mpa (10)

1.6 (16)

2.5 (25)

Test Pressure

1.5Mpa

2.4Mpa

3.75Mpa

Burst Pressure Mpa (Kgf/Cm2)

3 (30)

4.8 (48)

5.5 (55)

Vacuum Kpa (Kgf/Cm2)

53 (400)

86(660)

100 (750)

Materials

EPDM/NBR/SBR/NR/Butyl/Neo/Lined with PTFE

Diameter Range

DN15-DN600 (11/2"-24")

Connection Method

FLANGE\THREAD\CLAMP 

Flanges Dimensions

DIN, EN,ANSI, BS, JIS and other standards 

Applicable Medium

Air, compressed air, water, seawater, hot water, oil, acid, alkali etc.

Loading Port:

Qingdao, Shanghai China or other seaport

Shipment Terms:

FOB, CFR, CIF

Production Capacity:

250000 set

Payment Terms:

L/C, T/T, D/P

Connection:

Flange

Flange Material:

Carbon Steel, Stainless Steel

Period of Delivery

about 21 working days

Packing:

cartons, boxes or Plywood cases, or packing as per the buyer’s requirements

Product Logo:

LIDE or buyer’s logo, trademark

HS Code

4016999090

Threaded Union (TU)

SIZE

OAL Length

Allowable Movement-1

Dimensions

Operating Conditions

Nominal Diameter

Neutral OAL

Min Installed

Max Installed

Max Compressed

Max Extended

Axial Compression

Axial Extension

Lateral Deflection

Angular Deflection

OAL Fitting

OAL Body

Max w.p. (bar)

Max Vacuum (in. of Hg)-4

Inch

mm

                         

1/2"

15

8"

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±32.2°

0.92"

6.16"

150

26"

3/4"

20

8“

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±32.2°

1.00"

6.00"

150

26"

1"

25

8”

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±25.3°

1.25"

5.50"

150

26"

1-1/4"

32

8“

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±20.7°

1.25"

5.50"

150

26"

1-1/2"

40

8"

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±17.5°

1.35"

5.30"

150

26"

2"

50

8"

7.35"

8.12"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±13.3°

1.60"

4.80"

150

26"

2-1/2"

65

9.6"

8.95"

9.72"

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±10.7°

2.00"

5.60"

150

26"

3"

80

9.6"

8.95"

9.72'

7.13"

8.23"

0.87"

0.23"

+/-0.87"

±8.9°

2.00"

5.60"

150

26"

Threaded Union (TU)-Jis Standard

Nominal Dia

Nominal

Allowable Movements (mm)

Installation Tolerances (MM)

OAL Fitting  (MM)

OAL Body (MM)

Inch

mm

Length   (MM)

Lateral Deflection

Axial Extension

Axial Compression

Angular Deflection

Lateral Deflection

Axial Extension

Axial Compression

Angular Deflection

   

 1/2

15

180

15

10

15

15°

6

3

6

7.5°

30

120

 3/4

20

180

15

10

15

15°

6

3

6

7.5°

30

120

1

25

180

15

10

15

15°

6

3

6

7.5°

30

120

1 1/4

32

245

20

10

20

20°

8

3

6

7.5°

35

175

1 1/2

40

245

20

10

20

20°

8

3

6

7.5°

35

175

2

50

255

20

10

20

20°

8

3

6

7.5°

40

175

Our production process quality control

We treasure process quality control, there is very strict operation specification each process, which can ensure the goods quality:

1.    We use electronic weigher to weigh the weight of ingredients, the precision of weight is gram. So there is no surplus compounds elements;

2.    1.) By controlling material temperature and mixing time in the mixer machine, we can get qualified rubber mixed  composites.

      2) The calender process is the more critical phase, large steel rollers force rubber composites into smooth rubber sheets.

      3)The rubber sheets produced every day must be finished within the same day, we can ensure no rubber sheet remainder each day.

      4) All rubber sheets have passed the test of curometer.

production-process

3.  Adding adhesion agent in the mixture of rubber and nylon tire cord, then the rubber and nylon tire cord can be adhered together and turn into the integral. After vulcanization, all the rubbers are adhered tightly, it is very difficult to delaminate.

Below is the pictures of plastic sheet combined with rubber and nylon tire cord:

production-process2
production-process3

4. In wrapping process: all the elastomer constructions are made by hand-built and machine. After hand-builting, the underneath pressing roller moves along the elastomer body and compact the rubber sheets. There are two main functions of the roller, one is compacting the rubber sheets and making the rubber sheets more bonded, the other one is extruding air between rubber films. So it is very difficult to generate blisters and delamination after vulcanization.

production-process4

5. After vulcanization, there are 4 inspection processes: first qualified products inspection, trimming, assembling process, inspection for finished goods, if the goods with blisters are found then scrap.

Our certificates

production-process5
production-process6
production-process7
production-process8

Our workshop

production-process9
production-process10
production-process11

Our Test instruments

Hot-aging oven

production-process12

Electronic Universal testing machine

production-process13

hydrostatic test

production-process14

Rotorless Vulcanizer

production-process15

Low Temperature Testing Oven

production-process16

Digital  density balance

production-process17

FAQ

1.  Does the company accept to show buyer’s logo?

Yes, we can accept buyer’s logo or their trademark.

2.  What is the material of the products?

The flange materials are carbon steel and stainless steel, the materials of rubber elastomer are EPDM/NBR/SBR/NR/Butyl/Neo/Lined with PTFE.

3.  Does the company have approvals or certificate? If yes, what are they?

Yes, we have approvals, such as CE, Wras,ACS, ISO9001 certificate.

4.  What is the average lead time for delivery?

Our average lead time for delivery is between 3-4 weeks, from getting deposit or getting copy of LC.

5.  Does the company have the minimum order quantity requirement? If yes, What is it?

We accept minimum order quantity with 1 full pallet.

6.  What is the acceptable payment method?

We can accept T/T, L/C and D/P. Any other different payment method, we can talk further.

7.  Does the company have their own brand?

Yes, we have our own brand, LD logo.

8.  What is the advantage of the price-quality ratio?

Yes, the price of our goods is more competitive, it is much cheaper, but the quality is much better.

9.  Does the company have product liability insurance?

Yes, we can supply if required.

10. Does the company accept to OEM brand?

Yes, we can accept buyer’s logo or their trademark.

11. Does the company accept to supply samples?

Yes, we can accept samples, by DHL or other courier express.


  • Previous:
  • Next:

  • Write your message here and send it to us